1 thought on “PMP Study Tips – Sample Question

  1. gstramb Post author

    Correct answer is B. As the PMBOK® Guide states: “Before the baselines are established, changes are not required to be formally controlled by the Perform integrated Change Control process. Once the project is baselined, change requests go through this process.”

Leave a Reply